Wednesday, June 30, 2010

Progress Report

Here you can see the septic tank and drain field.

The entrance.

Half wall, we will remove the concrete header beam after the roof is finished.


Concrete floors.


Back door and window.


Beginning to frame the roof.

Friday, June 25, 2010

Double Rainbow

The rain brings rewards...

Art Niche

We filled in the door, but left your niche.

Exterior Stucco

Finishing up the exterior stucco.

Window Sills

Here you can see the design of the window sills.  We have these on all of the windows and they will get a square trim on the exterior.

Roof Beams

Here are the roof beams.  The color looks a little lite because I had to use the flash... still raining here.